The Sukhodol Port
Provides access to seaport infrastructure for small and medium coal producers, enabling prompt transhipment of coal products. The project is part of the federal programme Seaports of Russia and of the government programme for the development of the Far East and Trans-Baikal region.
Provides access to seaport infrastructure for small and medium coal producers, enabling prompt transhipment of coal products. The project is part of the federal programme Seaports of Russia and of the government programme for the development of the Far East and Trans-Baikal region.

The project is key for enabling power supply to the seaport Sukhodol

Customer: OOO Seaport Sukhodol

Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning (subcontracting OOO Energo SK, a Group company)

Launch date: 2021

Construction works for the M11 Moscow - Saint Petersburg high-speed road project
комплекс работ по строительству моста
комплекс работ по строительству моста

Customer: IC Ictas Insaat (Turkey)
Length: 699 km

Works performed: full-cycle construction of a bridge over the Izhora river, two slip roads over the Warsaw-bound railway tracks, a bridge over Pulkovskoe chaussee, and three overhead junctions (in the villages Voyskorovo and Dedorovskoye and over the Vitebsk-bound railway tracks)

Completion date: 2019

The Lavna Port
A part of the Murmansk transport hub development project, the Lavna Port is part of the Strategy for the Development of the Arctic. The port is important for the region and for developing the Northern Sea Route.
A part of the Murmansk transport hub development project, the Lavna Port is part of the Strategy for the Development of the Arctic. The port is important for the region and for developing the Northern Sea Route.

Объект: Строительство комплекса перегрузки угля «Лавна» в морском порту Мурманск Заказчик: ООО «Морской торговый порт Лавна»
Генподрядчик: АО «ТЭК МОСЭНЕРГО»
Технические характеристики: Общий годовой грузооборот на полное развитие - 18 млн. тонн экспорта угля в год

Виды выполняемых работ: Строительство на условиях «под ключ», включая проектные работы, поставку оборудования и материалов, строительно-монтажные и пусконаладочные работы.

Срок реализации: 2024

Construction of the 220/27.5/10 kV Sukhodol Substation
The general contract package
The general contract package

The project is key for enabling power supply to the seaport Sukhodol

Customer: OOO Seaport Sukhodol

Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning (subcontracting OOO Energo SK, a Group company)

Launch date: 2021

A 220 kV high-voltage transmission line Lesozavodsk-Spassk-Dalnevostochnaya
The general contract package
The general contract package

This transmission line was constructed to increase the reliability of power transmission lines in Russian Far East

Customer: PAO FSK EES

Works performed: the general contract package, including sourcing of equipment, construction and engineering, testing and commissioning works (subcontracting OOO Energo SK, a Group company)

Launch date: 2021

A 330 kV Talashkino Substation: modernisation and refitting
A full-cycle modernisation and refitting project for a 330 kV substation
A full-cycle modernisation and refitting project for a 330 kV substation

A 330 kV Talashkino Substation was built in 1970 and is a backbone of power infrastructure in Smolensk Region. Some of the transmission lines it feeds are part of the BRELL (Belarus, Russia, Estonia, Lithuania, Latvia) circular power system. The project increased the reliability of trunk power lines in the European part of Russia.

Customer: PAO FSK EES

Works performed: a full-cycle modernisation and refitting project for a 330 kV substation, including sourcing of equipment, construction and installation, testing and commissioning works

Launch date: 2018

Construction of the high-voltage power transmission line VL 300 Novosokolniki-Talashkino
A full-cycle construction project for a 330 kV single-circuit overhead line
A full-cycle construction project for a 330 kV single-circuit overhead line

This transmission line was constructed to increase the reliability of power transmission between the power systems of Russia’s Central and North-West federal districts.

Customer: PAO FSK EES
Length: 261.5 km

Works performed: a full-cycle construction project for a 330 kV single-circuit overhead line, including design and surveying works, sourcing of equipment, construction and installation, testing and commissioning works

Launch date: 2018

Amur (Svobodnenskaya) TES (Heat and Power Plant)
Supplies power and process steam to Amur GPZ (gas processing plant), which is fed by the Power of Siberia pipeline
Supplies power and process steam to Amur GPZ (gas processing plant), which is fed by the Power of Siberia pipeline

Customer: OOO GEKh Engineering
Designed by: OOO Mosenergoproyekt
General Contractor: AO TEK Mosenergo
Capacity: 160 MWt

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied:

  • a P-80-12,8/1,6 steam turbine (by AO Power Machines/LMZ) equipped with a TZFP-110-2UZ turbo generator (by AO Power Machines/Elektrosila)
  • a Е-320-13,8-560 G steam boiler (by PAO TKZ Krasniy Kotelshchik)

Launch date: 2021

750 kV OHPL (Overhead Power Line) Leningradskaya - Belozerskaya
The project increased stability of power supply to users in the North-Western and Central federal districts
The project increased stability of power supply to users in the North-Western and Central federal districts

The project addressed power surplus in the North-West unified power grid, providing a spillover solution. Innovative solutions were used to manufacture the wiring and masts for the line.

Customer: PAO FSK EES
Length: 191.5 km

Works performed: a full-cycle construction project for a 750 kV single-circuit overhead line, including sourcing of equipment, construction and installation, testing and commissioning works

Launch date: 2018

Grozny TES (Heat and Power Station)
Covers a significant part of the Chechen Republic’s energy needs
Covers a significant part of the Chechen Republic’s energy needs

Customer: OOO GEKh Engineering
Designed by: OOO Mosenergoproyekt
General contractor: AO Mosenergo
Capacity: two combined-cycle generation units, 180 MWt each

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment installed: two generation units, including:

  • a SGT5-2000E gas turbine (by Siemens) with a synchronous SGen5-100A-2P generator
  • a heating boiler unit

Launch date: 2019

Nizhne-Bureyskaya GES (Hydro Power Plant)
One of the biggest hydro power plants in Russia, which enabled a dramatic reduction of generation costs for the Eastern Power Grid and improved energy supply to the Far East.
One of the biggest hydro power plants in Russia, which enabled a dramatic reduction of generation costs for the Eastern Power Grid and improved energy supply to the Far East.

Customer: PAO RusHydro
Capacity: 320 MWt

Works performed: the general contract package, including full-cycle construction of the hydro facilities; development of working design documents for the hydromechanical equipment; manufacture and supply of the hydromechanical equipment, support systems, and other equipment of the powerhouse and control dam

Completion date: 2019

Sakhalin GRES-2 (District Power Station)
Ensures stable energy supply for Sakhalin, creating a capacity reserve for the new industrial and social projects on the island
Ensures stable energy supply for Sakhalin, creating a capacity reserve for the new industrial and social projects on the island

Customer: PAO Rushydro
Designed by: AO Institut Teploproyekt
General contractor: AO TEK Mosenergo
Capacity: two pulverised coal-fired generation units, 60 MWt each

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied:

  • a К-65-12,8 steam engine (by AO Ural Turbine Plant) with a turbo generator (by NPO Elsib)
  • a Е-230-13,8-560 steam boiler (by PAO TKZ Krasniy Kotelshchik).

Launch date: 2019

Yakutsk GRES-2 (district thermal power and heat plant)
Turnkey delivery of the general contract
Turnkey delivery of the general contract

Customer: PAO RusHydro
Designed by: AO Institut Teploelektroproyekt
General contractor: AO TEK Mosenergo
Capacity: four combined-cycle generation units totalling 193 MWt

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied:

  • an LM 6000 gas turbine unit (by GE)
  • a 42.4 GCal l/h horizontal waste-heat water boiler (by PAO TKZ Krasniy Kotelshchik)
  • a peak-load water boiler PTVM-100 (by OOO Belenergomash-BZEM).

Launch date: 2017

Adler TES (Heat and Power Plant)
Was launched to ensure stable power supply for the Sochi Olympic Games in 2014
Was launched to ensure stable power supply for the Sochi Olympic Games in 2014

Asset: Adlerskaya TES
Customer: PAO OGK-2
Designed by: OOO Mosenergoproyekt
General Contractor: AO TEK Mosenergo
Capacity: two combined-cycle units, 180 MWt each

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied:

two PGU-180T generation units featuring two V64.3А gas turbines (produced by Ansaldo Energia (Italy), supplied by AO Power Machines), a double-circuit waste heat boiler (produced by Podolsk Machinebuilding Plant and supplied by AO Power Machines), and a 48/62-7,4/0,12 steam turbine (produced by Kaluga Turbine Plant and supplied by AO Power Machines).

Launch date: 2012

Combined heat and power plants TETs-12, TETs-16, and TETs-20
Installation of combined-cycle gas turbines at TETs-12, TETs-16, and TETs-20 were key projects implemented for Moscow’s utility and engineering infrastructure under capacity supply agreements
Installation of combined-cycle gas turbines at TETs-12, TETs-16, and TETs-20 were key projects implemented for Moscow’s utility and engineering infrastructure under capacity supply agreements

Asset: TETs-12.
Construction of a PGU-220T Generation Unit
Customer: OOO Mezhregionenergostroy
Investor: PAO Mosenergo
Designed by: OOO Mosenergoproyekt
General contractor: AO TEK Mosenergo
Capacity: a 220 MWt combined-cycle unit

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied: a combined-cycle 220 MWt generation unit, featuring:

  • a GTE-160 gas turbine (by AO Power Machines/LMZ) with an air-cooled synchronous TZFG-160-2MUZ generator (by AO Power Machines/Elektrosila)
  • a PK-74 dual pressure waste heat boiler (no after burn) (by PAO Podolsk Machine Building Plant)
  • a Т-56/73-7,8/0,04 steam turbine (by AO Power Machines/Kaluga Turbine Plant) with an asynchronous air-cooled TZFP-80-2UZ generator (by AO Power Machines/Elektrosila).

Launch date: 2015

Asset: TETs-16.
Construction of a 420 MWt combined-cycle generation unit to replace and decommission the outdated existing unit
Customer: ООО Mezhregionenergostroy
Investor: PAO Mosenergo
Designed by: OOO Mosenergoproyekt
General contractor: AO TEK Mosenergo
Capacity: a 420 MWt combined-cycle unit

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied: a 420 MWt combined-cycle generation unit, featuring:

  • an SGT5-4000F gas turbine (by Siemens) with a synchronous SGen5-1000A generator (also by Siemens)
  • a three-circuit waste heat boiler paired with SGT5-4000F
  • a SST5-5000 steam turbine with a synchronous SGen5-100A generator (by Siemens).

Launch date: 2014

Recognition: in 2015, the project was awarded a diploma by the Moscow Mayor’s Office as the best utility infrastructure project of the year in Moscow

Asset: TETs-20.
Construction of a combined-cycle generation unit PGU-420T
Customer: ООО Mezhregionenergostroy
Investor: PAO Mosenergo
General contractor: AO TEK Mosenergo
Capacity: a 420 MWt combined-cycle generation unit

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment: a 420 MWt combined-cycle generation unit, featuring:

  • a gas turbine SGT5-4000F equipped with SGen5-1000A generators (by Siemens)
  • a three-circuit waste heat boiler (by OAO EMAlyans)
  • a steam turbine SST5-5000 equipped with a SGen5-100A-2P generator (by Siemens).

Launch date: 2016

Nizhneturinskaya GRES (district thermal power and heat plant)
Construction of two 230 MWt combined-cycle generation units
Construction of two 230 MWt combined-cycle generation units

Asset: Nizhneturinskaya GRES.
Construction of two 230 MWt combined-cycle generation units
Customer: PAO T Plus
Designed by: AO Teploelektroproyekt
General contractor: AO TEK Mosenergo
Capacity: two combined-cycle units, 230 MWt each

Services provided: turnkey delivery of the general contract, including engineering and surveying, construction and installation, testing and commissioning works, as well as equipment sourcing

Core equipment supplied: two 23 MWt combined-cycle generation units, featuring:

  • a GT13E2 gas turbine unit (by Alstom)
  • a three-circuit waste heat boiler Е-204/48,6-7,42/ 1,19-467/274 (PK-87) (by PAO Podolsk Machine Building Plant)
  • a КТ-63-7,7 steam turbine (by AO Urals Turbine Plant) with a TF-63-2UHL3 turbo generator (by NPO Elsib).

Launch date: 2015